Planning the work

Work items

One piece of work: who, when, what, and everything said about it.

Where: Click any card (or Full page in its popup)

On the item page

  • Title - click to edit, then Enter or ✓ to save, Esc or ✕ to cancel. Clicking away also saves.
  • Description - click it to edit, then Save or Cancel. It takes formatting, lists and images.
  • Planning - status, priority, type, location (floor on the site model) and labels.
  • People - the assignee does the work; the reporter raised it. Use Assign to me to take it.
  • Schedule - a start date and a due date. If the due date moves, the item remembers when it was first due.
  • Subtasks - break bigger work into smaller items with + Add subtask.
  • Custom fields - any extra fields your project added. Click Edit (or the values), change them, then Save or Cancel.

The tabs underneath

  • Comments - discuss the work; mention people with @ to notify them.
  • Attachments - upload drawings, photos, PDFs, Excel sheets, Word files, ZIPs - any file up to 10 MB. Drop files on the tab or click browse; pick several at once. Images show as thumbnails (click to enlarge); every file has a Download button that saves it under its own name. You can also add a link to a file kept elsewhere, like Google Drive.
  • Links - mark what this item is blocked by or blocks. A blocked item shows as Blocked until its blockers are done.
  • Activity - a history of every change.
  • Reminders - get a nudge about this item later, e.g. tomorrow at 9 AM.
💡Status, priority, people, labels, sprint, location and dates save as soon as you change them. Next to the item number you'll see Saving… then Saved. Click the item number (GRN-12) to copy it.