On site

Site model

A 3D model of your buildings - see the work floor by floor.

Where: Project sidebar → Site model (site projects)

  • Add each building with its floors, size and shape. The model is drawn for you, or you can upload your own 3D model - glTF/GLB, IFC, OBJ or FBX (from SketchUp, Revit, Blender, 3ds Max and others).
  • Use the switcher to look at one building at a time.
  • Click a floor to see the work on it, how much is done, and who's working there.
  • Tag a work item to a floor with its Location, then pin it to the exact spot, for example to mark a snag.
  • Crew - assign people to floors so everyone knows who is where.
  • Colour the floors by progress, status, open items or coverage, and drag the timeline to see the site on any date.
  • Walking route - set stops around the site so anyone can take a guided walk through the model.
💡Drag to turn, scroll to zoom, and use W A S D or the arrow keys to walk around.