Staying on top
Notifications
Know when you're assigned, mentioned, or something you follow changes.
- The bell shows your unread count and the latest few. Mark all read clears them.
- The Notifications page lists everything, with an Unread filter.
- Click a notification to open the item or report it's about.
Work items
- You're assigned to an item - when it's created for you or handed to you later.
- You're made the reporter of an item.
- Your item changes status - when someone else moves an item assigned to you, e.g. to Done.
- Someone @mentions you in a comment.
- Someone replies to your comment.
- Your item is ready to start - when the last item blocking it is done, so you can start straight away.
- Someone comments on your item - any new comment on an item you're assigned to or reported.
Daily reports
- End-of-day reminder - if today's report isn't submitted by the reminder time, everyone who can file reports for that project is nudged. It says whether the report is missing or still a draft.
- Report submitted - the owner and the project's managers get a one-line summary: workers on site, items done, hindrances and hours lost.
Materials
- A new material request - goes to everyone who can approve requests on that project (the owner, if nobody can), with what, how much and where.
- Your material request was approved, rejected (with the reason, if one was given) or fulfilled.
- Your request arrived - when the purchase order that includes it is marked received.
Reminders
- A reminder you set - 10 minutes before its time.
Billing (owner only)
- Paid seats running out - 7 days before, and again the day before, when your team is bigger than the free seats. Renew in Organization settings so nobody is locked out.
Work item update emails
- When someone else changes a work item you're assigned to or reported - status, title, description, priority, dates, sprint, type, labels, location, custom fields, who it's assigned to - comments on it, or adds or removes an attachment, you get an email listing what changed.
- Changes made close together arrive as one email, a couple of minutes after the last change, so editing several fields in a row doesn't flood your inbox. Emails about the same item stay in one thread.
- You're also told when you're taken off an item, and when an item you're on is deleted.
- Your own changes never email you.
- It's on for everyone by default. Turn off Work item update emails on the Notifications page to stop them - the bell and phone notifications keep working.
Get notifications on your phone
- 1Open Raidzo on your phone. On Android use Chrome and choose Install app; on iPhone use Safari, tap Share, then Add to Home Screen.
- 2Open Notifications in the app and turn on Notifications on this device.
- 3Tap Send a test notification to check it works.
Notifications not working?
It says "Blocked in this browser" - what do I do?
Two things can block them. First, the site: click the lock icon left of the address, open the site permissions and set Notifications to Allow. Second, your computer or phone: on Windows open Settings → System → Notifications and turn notifications on (and Do not disturb off); on a Mac open System Settings → Notifications and allow your browser. Then fully restart the browser and come back.
I allowed notifications but Edge still says "Blocked".
Edge keeps running in the background (Startup boost), so it doesn't notice a change to the Windows setting until it really restarts. Type edge://restart in the address bar - it reopens your tabs. If it still says Blocked, clear this site's cookies and site data (lock icon → Cookies and site data), reload, and turn notifications on again.
Brave shows "push service error".
Brave switches push notifications off by default. Open brave://settings/privacy, turn on Use Google services for push messaging, restart Brave and turn notifications on again.
How do I get notifications on my iPhone?
Apple only allows them for apps on the Home Screen, on iOS 16.4 or newer. In Safari tap Share → Add to Home Screen, open Raidzo from that icon, then turn on Notifications on this device. A normal Safari tab can't show them.
It's on, but the test notification never appears.
Check the device's own settings: notifications turned on for the browser, and Do not disturb / Focus off. On Windows, the main Notifications switch in Settings → System → Notifications blocks every browser when it's off.
Can I get them on both my laptop and my phone?
Yes - turn them on once on each device. Your devices in the Notifications panel lists every device that gets them, and a test is sent to all of them. Use Remove to stop an old computer or a lost phone.
Which browsers work?
Chrome, Edge, Firefox, Safari, Samsung Internet and Opera on computers and Android, plus the Home Screen app on iPhone and iPad. Private / incognito windows and the browsers built into other apps (for example links opened inside WhatsApp or Instagram) can't show them - open Raidzo in a normal browser window.