Planning the work
Work items
One piece of work: who, when, what, and everything said about it.
On the item page
- Title and description - click to edit. The description takes formatting, lists and images.
- Planning - status, priority, type, location (floor on the site model) and labels.
- People - the assignee does the work; the reporter raised it. Use Assign to me to take it.
- Schedule - a start date and a due date. If the due date moves, the item remembers when it was first due.
- Subtasks - break bigger work into smaller items with + Add subtask.
- Custom fields - any extra fields your project added.
The tabs underneath
- Comments - discuss the work; mention people with @ to notify them.
- Attachments - drawings, photos and documents.
- Links - mark what this item is blocked by or blocks. A blocked item shows as Blocked until its blockers are done.
- Activity - a history of every change.
- Reminders - get a nudge about this item later, e.g. tomorrow at 9 AM.
💡Click the item number (GRN-12) at the top of the page to copy it.